When this higly specialized company called us, it was in urgent need of  large precision components to drive a bridge structure. Only problem was no drawings were available.

With just the worn part as an example Kreber reverse engineered new production drawings, composed the building plan, qualified the welding procedures and prepared the quality inspection and test plan. After having agreed the procedures with the customer, Kreber manufactured an excellently straight, new toothed rack with high precision in a short time frame and to the full satisfaction of the customer.

Picture
Picture
Picture
Picture
Picture
Picture
Picture

Specifications

Length 8.000 mm
Weight 2.2 t